| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067644 | Name of Scheme: ROOR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 7 |
| Total Population Covered: 3352 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 03-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 27.03/135.29 | ROOR | 26.957832 | 79.480333 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSSIBLE PUMP | 700/73 | ROOR | 26.957832 | 79.480333 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/16 | ROOR | 26.957832 | 79.480333 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0289 | RISING MAINS |
| 2 | DI | 150 | 0.0041 | RISING MAINS |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 6.67 | DISTRIBUTION |
| 2 | HDPE | 63 | 5.487 | DISTRIBUTION |
| 3 | HDPE | 110 | 1.086 | DISTRIBUTION |
| 4 | HDPE | 140 | 2.146 | DISTRIBUTION |
| 5 | HDPE | 160 | 1.350 | DISTRIBUTION |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 836 |