| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067668 | Name of Scheme: PALA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2071 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 10-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18/99.32 | PALA | 79.763595 | 26.967229 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump-1 | 450 LPM/54 M | PALA | 79.763595 | 26.967229 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL/ 12 M | PALA | 79.763595 | 26.967229 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 80 | 0.0025 | |
| 2 | DI K-7 | 100 | 0.01425 | |
| 3 | DI K-7 | 150 | 0.00555 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.3377 | |
| 2 | HDPE | 63 | 2.3736 | |
| 3 | HDPE | 110 | 0.2599 | |
| 4 | HDPE | 140 | 1.3831 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 453 |