Project Completion Certificate (Ground Water)
Scheme ID: 20067697 Name of Scheme: SALEMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2595 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 07-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.06/144.82 SALEMPUR 79.435665 27.138454
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 550 LPM/61 M SALEMPUR 79.435665 27.138454
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 14 M SALEMPUR 79.435665 27.138454
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.027 Rising main
2 DI 150 0.007 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.30 Distribution
2 HDPE 63 2.05 Distribution
3 HDPE 110 2.014 Distribution
4 HDPE 140 1.82 Distribution
HSC Connection
Sno. Total Nos.
1 463
Other Details
2.79
2.77
2.37
11-Jul-2024
12-Jul-2024