Project Completion Certificate (Ground Water)
Scheme ID: 20067732 Name of Scheme: MAHUWARI Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 5230 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 29-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 28.06/111.83 Mahuwari 26.611826 82.494001
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 17.5 HP 1.02/44 Mahuwari 26.611826 82.492661
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Rcc 300kl/14 Mahuwari 26.618130 82.496225
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 2.323
2 HDPE Pipe PN-6: Class PE-100 75 1.309
3 HDPE Pipe PN-6: Class PE-100 63 21.892
4 HDPE Pipe PN-6: Class PE-100 110 1.873
5 HDPE Pipe PN-6: Class PE-100 140 1.934
6 HDPE Pipe PN-6: Class PE-100 160 2.064
7 HDPE Pipe PN-6: Class PE-100 180 0.310
8 HDPE Pipe PN-6: Class PE-100 200 0.038
HSC Connection
Sno. Total Nos.
1 830
Other Details
3.83
3.83
3.79
29-Jul-2025
30-Jul-2025