| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067733 | Name of Scheme: ALIPUR & BAHADURPUR MAJHGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 12 |
| Total Population Covered: 11410 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Sep-2024 | Actual Date of Completion (Capex): 15-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 267.56/45.05 | ALIPUR & BAHADURPUR MAJHGAWAN | 27.031855 | 79.505648 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSSIBLE PUMP | 1090/65 | ALIPUR & BAHADURPUR MAJHGAWAN | 27.031855 | 79.505648 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 625/18 | ALIPUR & BAHADURPUR MAJHGAWAN | 27.031855 | 79.505648 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0015 | Clear Water Rising Main |
| 2 | DI | 150 | 0.141 | Clear Water Rising Main |
| 3 | DI | 200 | 0.0054 | Clear Water Rising Main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 10.639 | Distribution Network |
| 2 | HDPE | 63 | 17.013 | Distribution Network |
| 3 | HDPE | 110 | 1.137 | Distribution Network |
| 4 | HDPE | 140 | 3.16 | Distribution Network |
| 5 | HDPE | 160 | 0.891 | Distribution Network |
| 6 | HDPE | 180 | 0.500 | Distribution Network |
| 7 | HDPE | 200 | 1.36 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1851 |