Project Completion Certificate (Ground Water)
Scheme ID: 20067758 Name of Scheme: MAKDOOMPUR Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 5280 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2024 Actual Date of Completion (Capex): 19-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 36.20M/69M Makdoompur 26.415264 82.960278
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 20 HP submersible Pump 1110LPM/45M Makdoompur 26.415264 82.960278
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 325KL/14MTR Makdoompur 26.415264 82.960278
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.952
2 HDPE Pipe PN-6: Class PE-100 75 1.315
3 HDPE Pipe PN-6: Class PE-100 63 9.645
4 HDPE Pipe PN-6: Class PE-100 125 1.216
5 HDPE Pipe PN-6: Class PE-100 140 1.040
6 HDPE Pipe PN-6: Class PE-100 160 0.988
7 HDPE Pipe PN-6: Class PE-100 200 0.344
HSC Connection
Sno. Total Nos.
1 565
Other Details
3.31
3.31
3.31
19-May-2025
20-May-2025