Project Completion Certificate (Ground Water)
Scheme ID: 20067858 Name of Scheme: SALEMPUR WATER SUPPLY SCHEMS No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3491 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-May-2024 Actual Date of Completion (Capex): 12-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 1 1 1 1
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 1 1 1 1 1
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 1 1 1 1 1
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 1 1 1 1
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 1 1 1 1
HSC Connection
Sno. Total Nos.
1 1
Other Details
1.00
0.00
1.00
12-Jun-2025
12-Jun-2025