Project Completion Certificate (Ground Water)
Scheme ID: 20067928 Name of Scheme: SANTBAI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2171 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Wwell 30.05 / 107.17 Satwai 29.127376 78.539588
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 500 / 50 500/50 Satwai 29.127376 78.539588
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 Satwai 29.127376 78.539588
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.002
2 HDPE 75 2.887
3 HDPE 90 0.192
4 HDPE 110 0.851
5 HDPE 140 0.297
6 HDPE 160 0.055
HSC Connection
Sno. Total Nos.
1 434
Other Details
1.80
0.00
1.86
10-Mar-2026
11-Mar-2026