Project Completion Certificate (Ground Water)
Scheme ID: 20067972 Name of Scheme: SONARI KANOO WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 18
Total Population Covered: 2474 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 18-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15 M / 60.32 M SONARI KANOO 26.083076 81.833974
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550 LPM / 54 M SONARI KANOO 26.083076 81.833974
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 16 M SONARI KANOO 26.083076 81.833974
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.910
2 HDPE 90 5.279
3 HDPE 110 1.696
4 HDPE 125 0.889
5 HDPE 140 0.354
6 HDPE 160 1.647
7 HDPE 180 0.456
HSC Connection
Sno. Total Nos.
1 487
Other Details
3.07
0.00
3.06
18-Sep-2024
19-Dec-2024