Project Completion Certificate (Ground Water)
Scheme ID: 20068046 Name of Scheme: USKA WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 6
Total Population Covered: 2405 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 26-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELLS 48/14 USKA 26.186545 81.980796
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 520 LPM/54 M USKA 26.186545 81.980796
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL/16 M USKA 26.186545 81.980796
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0224
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.510
2 HDPE 90 1.489
3 HDPE 110 1.622
4 HDPE 140 0.692
5 HDPE 160 1.270
6 HDPE 180 0.898
HSC Connection
Sno. Total Nos.
1 379
Other Details
3.17
0.00
3.15
26-Sep-2024
28-Dec-2024