| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20068050 | Name of Scheme: SANAHA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2680 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 01-Jun-2024 | Actual Date of Completion (Capex): 05-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.00/69.12 | SANAHA | 26.228722 | 81.90879 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP-1 | 600 LPM | SANAHA | 26.228722 | 81.90879 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 KL / 14 mtr | SANAHA | 26.228696 | 81.908755 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 32.80 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 13.18 | |
| 2 | HDPE PN-6 | 90 | 0.61 | |
| 3 | HDPE PN-6 | 110 | 0.82 | |
| 4 | HDPE PN-6 | 140 | 0.84 | |
| 5 | HDPE PN-6 | 180 | 0.75 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 533 |