Scheme ID: 20068063 Name of Scheme: KASTHUNI PURAB WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 10
Total Population Covered: 2937 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 28-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELLS 11.84/ 25 M KASTHUNI PURAB 26.354139 81.850910
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 620 LPM/52 M KASTHUNI PURAB 26.354139 81.850910
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL/14 M KASTHUNI PURAB 26.354139 81.850910
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0183
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.457
2 HDPE 90 0.683
3 HDPE 110 0.304
4 HDPE 140 0.902
5 HDPE 160 0.432
HSC Connection
Sno. Total Nos.
1 398
Other Details
3.06
0.00
2.99
28-Sep-2024
29-Dec-2024