Project Completion Certificate (Ground Water)
Scheme ID: 20068083 Name of Scheme: TARA PUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 1719 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 29-Apr-2024 Actual Date of Completion (Capex): 07-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 12/62.5 TARA PUR 29.201362 77.727027
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 400/52 TARA PUR 29.201362 77.727027
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/14 TARA PUR 29.201362 77.727027
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.80
2 HDPE 90 2.50
3 HDPE 110 0.37
4 HDPE 125 0.64
5 HDPE 160 0.79
HSC Connection
Sno. Total Nos.
Other Details
2.17
0.00
2.11
07-Feb-2025
09-May-2025