Project Completion Certificate (Ground Water)
Scheme ID: 20068319 Name of Scheme: PARIYAI WSS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2970 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.09/70.25 PARIYAI 26º 26' 36.589" N 82º 18' 19.246" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 21/42 PARIYAI 26º 26' 36.589" N 82º 18' 19.246" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Zink Alum Tank 100/14 PARIYAI 26º 26' 36.589" N 82º 18' 19.246" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 8.143
2 HDPE Pipe PN-6: Class PE-100 75 1.105
3 HDPE Pipe PN-6: Class PE-100 90 0.995
4 HDPE Pipe PN-6: Class PE-100 110 1.909
5 HDPE Pipe PN-6: Class PE-100 140 0.723
HSC Connection
Sno. Total Nos.
1 364
Other Details
170.97
0.00
0.00
25-Oct-2025
26-Oct-2025