| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20068335 | Name of Scheme: GARTHOLIYA & LOHANG PUR WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 13 |
| Total Population Covered: 4186 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Feb-2024 | Actual Date of Completion (Capex): 06-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 29.17 M / 60.69 M | GARTHOLIYA & LOHANG PUR | 26.255608 | 81.799236 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 880 LPM / 56 M | GARTHOLIYA & LOHANG PUR | 26.255608 | 81.799236 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250 KL / 18 M | GARTHOLIYA & LOHANG PUR | 26.255608 | 81.799236 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0265 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 24.904 | |
| 2 | HDPE | 90 | 2.514 | |
| 3 | HDPE | 110 | 0.845 | |
| 4 | HDPE | 125 | 1.318 | |
| 5 | HDPE | 160 | 1.439 | |
| 6 | HDPE | 180 | 0.612 | |
| 7 | HDPE | 200 | 1.750 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 994 |