| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20068337 | Name of Scheme: NARI KHERA GOGP JJM | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 5470 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Sep-2024 | Actual Date of Completion (Capex): 28-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 36 m/108 m | NARI KHERA | 27.714865 | 80.197578 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 1160 LPM/47 M | NARI KHERA | 27.714865 | 80.197578 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350 KL/18 M | NARI KHERA | 27.714865 | 80.197578 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 200 | .033 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.021 | |
| 2 | HDPE | 75 | 2.746 | |
| 3 | HDPE | 90 | 3.328 | |
| 4 | HDPE | 110 | .806 | |
| 5 | HDPE | 125 | .356 | |
| 6 | HDPE | 160 | .139 | |
| 7 | HDPE | 180 | .116 | |
| 8 | HDPE | 200 | 2.906 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 884 |