Project Completion Certificate (Ground Water)
Scheme ID: 20068356 Name of Scheme: MANADAWA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3795 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 22-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 28.04/92.83 MANADAWA 26.517935 81.687572
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 800 LPM / 56 M MANADAWA 26.517935 81.687572
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 250 KL/ 18 M MANADAWA 26.517935 81.687572
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.508
2 HDPE 90 1.137
3 HDPE 110 2.107
4 HDPE 140 0.245
5 HDPE 160 0.140
6 HDPE 180 0.181
7 HDPE 200 0.690
HSC Connection
Sno. Total Nos.
1 563
Other Details
3.58
0.00
3.56
22-Jan-2025
23-Apr-2025