Project Completion Certificate (Ground Water)
Scheme ID: 20068359 Name of Scheme: Kanwakhera Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3842 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Feb-2024 Actual Date of Completion (Capex): 10-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.10 / 118.80 Kanwakhera 27.545412 80.662092
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 810 / 48 Kanwakhera 27.545412 80.662092
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 / 12 Kanwakhera 27.545412 80.662092
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 7.079
2 HDPE Pipe 75 0.655
3 HDPE Pipe 90 0.325
4 HDPE Pipe 110 0.412
5 HDPE Pipe 140 0.503
6 HDPE Pipe 160 0.507
7 HDPE Pipe 200 0.142
HSC Connection
Sno. Total Nos.
1 693
Other Details
2.61
0.00
2.63
04-Sep-2024
23-Nov-2024