| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20068359 | Name of Scheme: Kanwakhera Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3842 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Feb-2024 | Actual Date of Completion (Capex): 10-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.10 / 118.80 | Kanwakhera | 27.545412 | 80.662092 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 810 / 48 | Kanwakhera | 27.545412 | 80.662092 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 250 / 12 | Kanwakhera | 27.545412 | 80.662092 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe | 63 | 7.079 | |
| 2 | HDPE Pipe | 75 | 0.655 | |
| 3 | HDPE Pipe | 90 | 0.325 | |
| 4 | HDPE Pipe | 110 | 0.412 | |
| 5 | HDPE Pipe | 140 | 0.503 | |
| 6 | HDPE Pipe | 160 | 0.507 | |
| 7 | HDPE Pipe | 200 | 0.142 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 693 |