Project Completion Certificate (Ground Water)
Scheme ID: 20068372 Name of Scheme: KANAK SINGHPUR & KORARI HEERSHAH WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3844 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2024 Actual Date of Completion (Capex): 10-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27/75.34 KANAK SINGHPUR & KORARI HEERSHAH 29.190692 77.558347
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 810/52 KANAK SINGHPUR & KORARI HEERSHAH 29.190692 77.558347
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/14 KANAK SINGHPUR & KORARI HEERSHAH 29.190692 77.558347
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 26.52
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 13.78
2 HDPE 90 1.46
3 HDPE 110 0.45
4 HDPE 140 1.70
5 HDPE 160 1.43
6 HDPE 180 1.019
7 HDPE 200 0.94
HSC Connection
Sno. Total Nos.
1 617
Other Details
4.47
0.00
4.38
10-Feb-2025
11-May-2025