Scheme ID: 20068382 Name of Scheme: PARSOYIA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 2541 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2024 Actual Date of Completion (Capex): 27-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 32.05 M / 227.25 M PARSOYIA 29.064433 77.610722
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 540 LPM / 54 M PARSOYIA 29.064433 77.610722
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 16 M PARSOYIA 29.064433 77.610722
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 12.622
2 HDPE 90 1.603
3 HDPE 110 0.458
4 HDPE 140 2.263
5 HDPE 180 0.072
HSC Connection
Sno. Total Nos.
1 456
Other Details
3.16
0.00
3.15
27-Sep-2024
28-Dec-2024