Project Completion Certificate (Ground Water)
Scheme ID: 20068526 Name of Scheme: SOHALIYA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2410 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 29-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.586
2 HDPE 75 1.3008
3 HDPE 63 7.65
4 HDPE 110 0.1723
5 HDPE 140 1.0967
HSC Connection
Sno. Total Nos.
Other Details
2.00
0.00
2.07
29-Aug-2024
29-Sep-2024