Project Completion Certificate (Ground Water)
Scheme ID: 20068658 Name of Scheme: KAILIRAMPUR & AMINABAD URF BARAGAON No. of Villages: 2 No. of Habitation Covered: 1
Total Population Covered: 5254 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 07-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 45.33 Mtr / 93.52 Mtr Kailirampur 28.943791 77.940812
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1000 LPM / 56 Mtr Kailirampur 28.943791 77.940812
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 18 M Kailirampur 28.943791 77.940812
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 0.3054 Laying work done in Kailirampur Only
2 HDPE 90 1.833 Laying work done in Kailirampur Only
3 HDPE 180 0.910 Laying work done in Kailirampur Only
HSC Connection
Sno. Total Nos.
1 515
Other Details
4.75
4.75
2.79
28-Oct-2024
29-Oct-2024