Project Completion Certificate (Ground Water)
Scheme ID: 20069962 Name of Scheme: puran purwa No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3673 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 05-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 16/74.53 PURAN PURWA 26.724642 79.720656
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 700/70 PURAN PURWA 26.724642 79.720656
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/14 PURAN PURWA 26.724642 79.720656
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.1375
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.365
2 HDPE 90 2.110
3 HDPE 110 1.447
4 HDPE 125 0.436
5 HDPE 140 0.317
6 HDPE 160 0.495
HSC Connection
Sno. Total Nos.
1 758
Other Details
3.36
0.00
2.75
11-Apr-2024
12-Apr-2024