| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20070038 | Name of Scheme: EDALPUR WSS | No. of Villages: 2 | No. of Habitation Covered: 1 |
| Total Population Covered: 3838 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 01-Jan-2025 | Actual Date of Completion (Capex): 31-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL PIPE | 36/100.43 | SHEKHA | 27.850589° | 78.227702° |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 30/48 | SHEKHA | 27.850589° | 78.227702° |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | CONVENTIONAL | 150/12 | SHEKHA | 27.850666° | 78.227794° |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 45 | TW TO OHT |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 140 | 1.8084 | VILLAGE NETWORK |
| 2 | HDPE | 110 | 0.198 | |
| 3 | HDPE | 90 | 0.4035 | |
| 4 | HDPE | 75 | 0.1530 | VILLAGE NETWORK |
| 5 | HDPE | 63 | 3.4489 | VILLAGE NETWORK |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 350 |