Project Completion Certificate (Ground Water)
Scheme ID: 20070038 Name of Scheme: EDALPUR WSS No. of Villages: 2 No. of Habitation Covered: 1
Total Population Covered: 3838 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 01-Jan-2025 Actual Date of Completion (Capex): 31-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL PIPE 36/100.43 SHEKHA 27.850589° 78.227702°
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 30/48 SHEKHA 27.850589° 78.227702°
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 CONVENTIONAL 150/12 SHEKHA 27.850666° 78.227794°
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 45 TW TO OHT
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 140 1.8084 VILLAGE NETWORK
2 HDPE 110 0.198
3 HDPE 90 0.4035
4 HDPE 75 0.1530 VILLAGE NETWORK
5 HDPE 63 3.4489 VILLAGE NETWORK
HSC Connection
Sno. Total Nos.
1 350
Other Details
240.81
200.56
135.34
05-Dec-2024
10-Feb-2025