| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20070058 | Name of Scheme: BALRAMPUR WSS | No. of Villages: 1 | No. of Habitation Covered: 0 |
| Total Population Covered: 3956 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 20-Mar-2024 | Actual Date of Completion (Capex): 11-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELLS | 33/101.78 | BALRAMPUR | 27.837023° | 78.137341° |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 33.6/42 | BALRAMPUR | 27.837023° | 78.137341° |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | CONVENTIONAL | 175/16 | BALRAMPUR | 27.836919° | 78.137377° |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 43 | PH TO OHT |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 4.682 | |
| 2 | HDPE PIPE | 75 | 0.646 | |
| 3 | HDPE PIPE | 90 | 0.051 | |
| 4 | HDPE PIPE | 125 | 0.344 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 281 |