Project Completion Certificate (Ground Water)
Scheme ID: 20070191 Name of Scheme: AMILIYA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1784 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 17-Apr-2023 Actual Date of Completion (Capex): 16-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/155 Amiliya 26.195817 79.881295
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 380/72 Amiliya 26.195817 79.881295
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/16 Amiliya 26.195817 79.881295
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 3.51
2 HDPE PIPE 75 0.508
3 HDPE PIPE 90 0.161
4 HDPE PIPE 125 0.378
HSC Connection
Sno. Total Nos.
1 400
Other Details
1.46
0.00
1.81
16-Mar-2025
17-Mar-2025