| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20070218 | Name of Scheme: Muradabad Village Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3536 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 01-Jul-2024 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 26.07m/79.54m | moradabad | 28.840083 | 77.653076 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 470LPM/51M | moradabad | 28.840083 | 77.653076 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL/12M | moradabad | 28.840083 | 77.653076 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | .022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.642 | |
| 2 | HDPE | 75 | .405 | |
| 3 | HDPE | 90 | .077 | |
| 4 | HDPE | 110 | .299 | |
| 5 | HDPE | 125 | .073 | |
| 6 | HDPE | 160 | .085 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 489 |