Project Completion Certificate (Ground Water)
Scheme ID: 20070856 Name of Scheme: SARIYA DUBAAN WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 2190 Base Year: 2023 Intermediate Year: 2033 Design Year: 2053
Date of Completion (As per Contract): 07-Feb-2024 Actual Date of Completion (Capex): 23-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15.06 / 50.02 SARIYA DUBAAN 26.095260 81.70940934
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550 LPM / 54 M SARIYA DUBAAN 26.095260 81.70940934
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL / 16 M SARIYA DUBAAN 26.095260 81.70940934
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0316
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.625
2 HDPE 90 3.141
3 HDPE 110 0.581
4 HDPE 125 0.541
5 HDPE 140 0.769
6 HDPE 160 0.452
HSC Connection
Sno. Total Nos.
1 484
Other Details
2.55
0.00
2.53
23-Mar-2025
09-Jun-2025