Project Completion Certificate (Ground Water)
Scheme ID: 20070858 Name of Scheme: KANOO WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 14
Total Population Covered: 2176 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 07-Feb-2024 Actual Date of Completion (Capex): 24-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18 / 68.32 KANOO 26.061577 81.838093
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500 LPM / 50 M KANOO 81.838093 26.061577
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 / 12 KANOO 81.838093 26.061577
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0226
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.811
2 HDPE 90 5.098
3 HDPE 110 2.047
4 HDPE 125 0.293
5 HDPE 140 0.368
HSC Connection
Sno. Total Nos.
1 308
Other Details
2.64
0.00
2.50
27-Sep-2024
28-Dec-2024