Project Completion Certificate (Ground Water)
Scheme ID: 20070878 Name of Scheme: GAIMAU WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 1965 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2024 Actual Date of Completion (Capex): 07-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.7 M / 109.87 M GAIMAU 29.213965 77.544248
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SYBMERSIBLE 420 LPM / 50 M GAIMAU 29.213965 77.544248
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL / 12 M GAIMAU 29.213965 77.544248
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.078
2 HDPE 90 1.462
3 HDPE 110 1.117
4 HDPE 140 1.022
5 HDPE 160 0.021
HSC Connection
Sno. Total Nos.
1 386
Other Details
2.30
0.00
2.27
07-Sep-2024
08-Dec-2024