Scheme ID: 20070881 Name of Scheme: BIKHANPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2031 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2024 Actual Date of Completion (Capex): 19-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24 m / 241.67 m BIKHANPUR 29.224756 78.045727
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 440 LPM / 52 m BIKHANPUR 29.224756 78.045727
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL / 14 m BIKHANPUR 29.224756 78.045727
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.866
2 HDPE 90 0.516
3 HDPE 110 0.493
4 HDPE 140 0.719
5 HDPE 160 0.013
HSC Connection
Sno. Total Nos.
1 281
Other Details
2.06
0.00
2.03
19-Sep-2024