| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20070889 | Name of Scheme: KOHRA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 13 |
| Total Population Covered: 5091 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Feb-2023 | Actual Date of Completion (Capex): 16-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 15 M / 51.55 M | KOHRA | 26.19646 | 81.69346 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 990 LPM / 52 M | KOHRA | 26.19646 | 81.69346 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300 KL / 14 M | KOHRA | 26.19646 | 81.69346 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 16.446 | |
| 2 | HDPE | 90 | 4.021 | |
| 3 | HDPE | 110 | 1.162 | |
| 4 | HDPE | 140 | 0.905 | |
| 5 | HDPE | 160 | 1.570 | |
| 6 | HDPE | 180 | 0.433 | |
| 7 | HDPE | 200 | 0.747 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 739 |