Project Completion Certificate (Ground Water)
Scheme ID: 20070953 Name of Scheme: JALALPUR UMAR & KUA KHERA MVS (O) No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1803 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Dec-2024 Actual Date of Completion (Capex): 18-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.0/100.89 Jalalpur Umar 28.790463 78.455682
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 370/45 Jalalpur Umar 28.790463 78.455682
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 100/12 Jalalpur Umar 28.790298 78.455847
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 100 0.035 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 75 0.7756
2 PN-6 PE100/HDPE 90 0.4787
3 PN-6 PE100/HDPE 110 0.112
4 PN-6 PE100/HDPE 140 0.024
5 PN-6 PE100/HDPE 63 6.549
HSC Connection
Sno. Total Nos.
1 368
Other Details
1.55
1.55
0.00
02-Jan-2025
03-Jan-2025