Project Completion Certificate (Ground Water)
Scheme ID: 20070954 Name of Scheme: HAWAASPUR WSS No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 1810 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Jan-0024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.00/83.25 HAWAASPUR 27.974056 79.615356
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump - 1 22.80 M3 / 45 M HAWAASPUR 27.974056 79.615356
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 100 KL - 14 M HAWAASPUR 27.974170 79.615391
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 3.723
2 HDPE/6KG 75 0.153
3 HDPE/6KG 90 1.798
4 HDPE/6KG 110 1.631
5 HDPE/6KG 140 0.081
HSC Connection
Sno. Total Nos.
1 282
Other Details
1.63
0.00
1.63
14-Apr-2024
06-Dec-2024