| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20071110 | Name of Scheme: PEEPLI KALAN URF RAIPUR & KAFOORPUR MVS (O) | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 3409 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2027 | Actual Date of Completion (Capex): 07-Jul-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 24.04/106.22 | Pipli Kalan Urf Raipur | 28.889122 | 78.345862 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 670/47 | Pipli Kalan Urf Raipur | 28.889122 | 78.345862 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 200/16 | Pipli Kalan Urf Raipur | 28.889122 | 78.345862 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 125 | 0.035 | 0.035 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 90 | 0.0354 | |
| 2 | PN-6 PE100/HDPE | 75 | 0.7325 | |
| 3 | PN-6 PE100/HDPE | 63 | 9.1788 | |
| 4 | PN-6 PE100/HDPE | 110 | 0.112 | |
| 5 | PN-6 PE100/HDPE | 125 | 0.4191 | |
| 6 | PN-6 PE100/HDPE | 140 | 0.5981 | |
| 7 | PN-6 PE100/HDPE | 160 | 0.3995 | |
| 8 | PN-6 PE100/HDPE | 180 | 0.0665 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 596 |