| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20071275 | Name of Scheme: RE-ORGANISATION OF SADDU KA MAZRA(NANKAR RANI) VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 970 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-Mar-2023 | Actual Date of Completion (Capex): 10-Jul-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN -6: CLASS PE -100 | 63 | 0.67 | |
| 2 | HDPE PIPE PN -6: CLASS PE -100 | 75 | 0.16 | |
| 3 | HDPE PIPE PN -6: CLASS PE -100 | 110 | 0.16 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 89 |