| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20071280 | Name of Scheme: BASIPUR SVS (S) | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2402 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 19-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.03/99.94 | Basipur | 28.936362 | 78.320388 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible 10 HP | 27 Cum /44 M | Basipur | 28.936362 | 78.320388 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc Tank | 150 KL/ 12 M | Basipur | 28.936362 | 78.320388 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | .035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | .5209 | |
| 2 | HDPE | 75 | .2832 | |
| 3 | HDPE | 63 | 4.3157 | |
| 4 | HDPE | 140 | .1142 | |
| 5 | HDPE | 160 | .1218 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 408 |