| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20071477 | Name of Scheme: HARDASPUR WSS | No. of Villages: 1 | No. of Habitation Covered: 0 |
| Total Population Covered: 2641 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 21-Mar-2024 | Actual Date of Completion (Capex): 01-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELLS | 24/77.15 | HARDASPUR | 27.898077 | 78.015436 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 23.4 | HARDASPUR | 27.898077 | 78.015436 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank | 125 KL 14 M | HARDASPUR | 27.898077 | 78.015436 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 125 | 0.040 | Ok |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 1.651 | |
| 2 | HDPE PIPE | 75 | 0.923 | |
| 3 | HDPE PIPE | 110 | 0.130 | |
| 4 | HDPE PIPE | 125 | 0.381 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 300 |