Project Completion Certificate (Ground Water)
Scheme ID: 20071477 Name of Scheme: HARDASPUR WSS No. of Villages: 1 No. of Habitation Covered: 0
Total Population Covered: 2641 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Mar-2024 Actual Date of Completion (Capex): 01-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELLS 24/77.15 HARDASPUR 27.898077 78.015436
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 23.4 HARDASPUR 27.898077 78.015436
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 125 KL 14 M HARDASPUR 27.898077 78.015436
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 125 0.040 Ok
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 1.651
2 HDPE PIPE 75 0.923
3 HDPE PIPE 110 0.130
4 HDPE PIPE 125 0.381
HSC Connection
Sno. Total Nos.
1 300
Other Details
145.40
144.45
144.45
31-Dec-2024
01-Jan-2025