Project Completion Certificate (Ground Water)
Scheme ID: 20071520 Name of Scheme: BRASIN WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 7789 Base Year: 2023 Intermediate Year: 2035 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 23-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26 M / 274.25 M Brasin 26.37747669 81.96363782
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 515 LPM / 50 M Brasin 26.37747669 81.96363782
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 16 M Brasin 26.37747669 81.96363782
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 1.710
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE-100 63 20.26
2 HDPE / PN-6: Class PE-100 75 1.427
3 HDPE / PN-6: Class PE-100 90 0.533
4 HDPE / PN-6: Class PE-100 110 1.391
5 HDPE / PN-6: Class PE-100 125 1.051
6 HDPE / PN-6: Class PE-100 140 0.85
7 HDPE / PN-6: Class PE-100 160 0.1
8 HDPE / PN-6: Class PE-100 180 0.829
9 HDPE / PN-6: Class PE-100 200 0.37
HSC Connection
Sno. Total Nos.
1 810
Other Details
4.52
0.00
4.62
27-May-2025
01-Aug-2025