Project Completion Certificate (Ground Water)
Scheme ID: 20071542 Name of Scheme: HARKHI PURBIRIPUR ,BAHMARPUR,UTTARGAON &MASETAVA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 6 No. of Habitation Covered: 12
Total Population Covered: 12600 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 25-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 55.02 M / 192.23 M HARKHI PURBIRIPUR ,BAHMARPUR,UTTARGAON &MASETAVA 26.33682 81.910558
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 650 LPM / 50 M HARKHI PURBIRIPUR ,BAHMARPUR,UTTARGAON &MASETAVA 26.33682 81.910558
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 375 & 125 KL / 16 & 12 M HARKHI PURBIRIPUR ,BAHMARPUR,UTTARGAON &MASETAVA 26.33682 81.910558
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 80 0.015
2 DI / K7 125 0.280
3 DI / K7 200 0.315
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6:Class PE-100 63 37.533
2 HDPE / PN-6:Class PE-100 75 4.778
3 HDPE / PN-6:Class PE-100 90 2.168
4 HDPE / PN-6:Class PE-100 110 2.274
5 HDPE / PN-6:Class PE-100 125 1.335
6 HDPE / PN-6:Class PE-100 140 2.133
7 HDPE / PN-6:Class PE-100 160 0.73
8 HDPE / PN-6:Class PE-100 180 0.839
9 HDPE / PN-6:Class PE-100 200 0.96
HSC Connection
Sno. Total Nos.
1 1565
Other Details
8.09
0.00
8.24
26-Sep-2025
01-Nov-2025