Project Completion Certificate (Ground Water)
Scheme ID: 20071768 Name of Scheme: KOYLI GP W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2380 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jan-2024 Actual Date of Completion (Capex): 18-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.04 /102.19 Koyli 28.813694 79.07812
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC PUMP 34.2 Koyli 28.813694 79.07812
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zn-Alm 175/12 Koyli 28.813694 79.07812
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 125 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 75 0.403
2 HDPE 63 3.418
3 HDPE 110 1.244
4 HDPE 125 0.165
5 HDPE 160 0.030
HSC Connection
Sno. Total Nos.
1 489
Other Details
180.83
190.72
190.72
14-Jan-2025
20-Jan-2025