Project Completion Certificate (Ground Water)
Scheme ID: 20072230 Name of Scheme: SHIKHERA, BHIRWARA & ACHI KALAN No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 5492 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 15-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 42.85 Mtr / 97.35 Mtr SHIKHERA - BHIRWARA - ACHI 29.022244 77.966775
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1050 LPM / 56 Mtr SHIKHERA - BHIRWARA - ACHI 29.022244 77.966775
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 18 M SHIKHERA - BHIRWARA - ACHI 29.022244 77.966775
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.640
2 HDPE 90 4.067
3 HDPE 110 0.081
4 HDPE 125 0.377
5 HDPE 140 1.494
6 HDPE 160 0.497
HSC Connection
Sno. Total Nos.
1 915
Other Details
4.53
4.53
3.59
08-Jan-2025
09-Jan-2025