| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072467 | Name of Scheme: KARMAHI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 13 |
| Total Population Covered: 3752 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 21-Feb-2024 | Actual Date of Completion (Capex): 13-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300X300 | 9.07/66.09 | Karmahi | 25.725947 | 82.767262 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 H.P | 759 | Karmahi | 25.726156 | 82.767414 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225/12 | Karmahi | 25.726022 | 82.767326 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0179 | |
| 2 | DI | 200 | 0.004 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.09 | |
| 2 | HDPE | 110 | 1.25 | |
| 3 | HDPE | 160 | 0.91 | |
| 4 | HDPE | 200 | 0.04 | |
| 5 | HDPE | 90 | 2.65 | |
| 6 | HDPE | 75 | 4.04 | |
| 7 | HDPE | 140 | 0.776 | |
| 8 | HDPE | 180 | 0.429 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 585 |