Scheme ID: 20072467 Name of Scheme: KARMAHI VILLAGE WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 13
Total Population Covered: 3752 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Feb-2024 Actual Date of Completion (Capex): 13-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300X300 9.07/66.09 Karmahi 25.725947 82.767262
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 H.P 759 Karmahi 25.726156 82.767414
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/12 Karmahi 25.726022 82.767326
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0179
2 DI 200 0.004
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.09
2 HDPE 110 1.25
3 HDPE 160 0.91
4 HDPE 200 0.04
5 HDPE 90 2.65
6 HDPE 75 4.04
7 HDPE 140 0.776
8 HDPE 180 0.429
HSC Connection
Sno. Total Nos.
1 585
Other Details
312.23
312.23
275.00
09-Mar-2025