| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072554 | Name of Scheme: BAGARPUR MAFI & JHANAKPURI MVS (O) | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 1972 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2027 | Actual Date of Completion (Capex): 05-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.05/95.31 | Bagarpur Mafi | 28.8296 | 78.3435 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 410/40 | Bagarpur Mafi | 28.8296 | 78.3435 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 125/12 | Bagarpur Mafi | 28.82958993 | 78.34312891 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 100 | 0.0368 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 90 | 0.7487 | |
| 2 | PN-6 PE100/HDPE | 75 | 1.031 | |
| 3 | PN-6 PE100/HDPE | 63 | 5.0117 | |
| 4 | PN-6 PE100/HDPE | 110 | 0.406 | |
| 5 | PN-6 PE100/HDPE | 125 | 0.037 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 245 |