Project Completion Certificate (Ground Water)
Scheme ID: 20072585 Name of Scheme: CHATARPUR SV W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1674 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 18-Sep-2024 Actual Date of Completion (Capex): 30-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.02 / 79.83 Chatarpur 28.508933 78.995836
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible Pump 21.6 / 40 Chatarpur 28.508933 78.995836
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 125 / 12 Chatarpur 28.508986 78.995931
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.02875
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.3883
2 HDPE Pipe PN-6: Class PE-100 75 0.1464
3 HDPE Pipe PN-6: Class PE-100 63 2.1553
4 HDPE Pipe PN-6: Class PE-100 110 0.459
5 HDPE Pipe PN-6: Class PE-100 140 0.0141
HSC Connection
Sno. Total Nos.
1 368
Other Details
1.26
1.43
1.43
05-Apr-2024
06-Apr-2024