| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072692 | Name of Scheme: LATHIRA MAFI & MANGRAULI MVS (O) | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 6312 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2027 | Actual Date of Completion (Capex): 09-Jul-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 39.16/101.48 | Latheera Mafi | 28.688287 | 78.259117 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 1256.41/49.47 | Latheera Mafi | 28.688287 | 78.259117 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Conventional Tank | 350/12 | Latheera Mafi | 28.688432 | 78.258925 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 200 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 90 | 1.012 | |
| 2 | PN-6 PE100/HDPE | 75 | 5.0978 | |
| 3 | PN-6 PE100/HDPE | 63 | 5.4816 | |
| 4 | PN-6 PE100/HDPE | 110 | 0.4177 | |
| 5 | PN-6 PE100/HDPE | 125 | 0.3168 | |
| 6 | PN-6 PE100/HDPE | 140 | 1.0788 | |
| 7 | PN-6 PE100/HDPE | 160 | 0.213 | |
| 8 | PN-6 PE100/HDPE | 180 | 2.0836 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 893 |