| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072739 | Name of Scheme: KUDARKI BHOOR SVS (O) | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1639 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 10-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 17.99/96.25 | Kundarki Bhoor | 28.727993 | 78.408333 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 350/44 | Kundarki Bhoor | 28.727993 | 78.408333 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 100/12 | Kundarki Bhoor | 28.728 | 78.408257 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 100 | 0.030 | 0.030 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 63 | 3.1671 | |
| 2 | PN-6 PE100/HDPE | 90 | 0.2248 | |
| 3 | PN-6 PE100/HDPE | 110 | 0.0788 | |
| 4 | PN-6 PE100/HDPE | 125 | 0.3862 | |
| 5 | PN-6 PE100/HDPE | 140 | 0.117 | |
| 6 | PN-6 PE100/HDPE | 160 | 0.7216 | |
| 7 | PN-6 PE100/HDPE | 180 | 0.2521 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 296 |