Project Completion Certificate (Ground Water)
Scheme ID: 20072771 Name of Scheme: SEWANGEE &KASTOORIPUR WATER SUPPY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3502 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2025 Actual Date of Completion (Capex): 15-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 70.80 SAWANGEE 26.148048 81.936517
2 150MM SLOTTED PIPE 12 SAWANGEE 26.148048 81.936517
3 300MM PLAIN PIPE 44 SAWANGEE 26.148048 81.936517
4 300MM SLOTTED PIPE 15 SAWANGEE 26.148048 81.936517
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 750LPM / 54MTR SAWANGEE 26.148048 81.936517
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 200KL / 16MTR SAWANGEE 26.148048 81.936517
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 .021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 5.936
2 HDPE PIPE 63 13.935
3 HDPE PIPE 110 3.26
4 HDPE PIPE 125 1.420
5 HDPE PIPE 140 1.262
6 HDPE PIPE 160 .544
7 HDPE PIPE 180 .564
HSC Connection
Sno. Total Nos.
1 571
Other Details
4.21
0.00
4.13
19-Dec-2024
10-Mar-2025