| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072771 | Name of Scheme: SEWANGEE &KASTOORIPUR WATER SUPPY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 3502 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-May-2025 | Actual Date of Completion (Capex): 15-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 70.80 | SAWANGEE | 26.148048 | 81.936517 |
| 2 | 150MM SLOTTED PIPE | 12 | SAWANGEE | 26.148048 | 81.936517 |
| 3 | 300MM PLAIN PIPE | 44 | SAWANGEE | 26.148048 | 81.936517 |
| 4 | 300MM SLOTTED PIPE | 15 | SAWANGEE | 26.148048 | 81.936517 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 750LPM / 54MTR | SAWANGEE | 26.148048 | 81.936517 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 200KL / 16MTR | SAWANGEE | 26.148048 | 81.936517 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | .021 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 5.936 | |
| 2 | HDPE PIPE | 63 | 13.935 | |
| 3 | HDPE PIPE | 110 | 3.26 | |
| 4 | HDPE PIPE | 125 | 1.420 | |
| 5 | HDPE PIPE | 140 | 1.262 | |
| 6 | HDPE PIPE | 160 | .544 | |
| 7 | HDPE PIPE | 180 | .564 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 571 |