| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072806 | Name of Scheme: GHOSIYAN & KASTOORIPUR WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 9 |
| Total Population Covered: 4144 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Dec-2024 | Actual Date of Completion (Capex): 24-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 41.3 | GHOSIYAN ARAULI | 26.318581 | 81.731691 |
| 2 | 300MM PLAIN PIPE | 52.0 | GHOSIYAN ARAULI | 26.318581 | 81.731691 |
| 3 | 150MM SLOTTED PIPE | 09.0 | GHOSIYAN ARAULI | 26.318581 | 81.731691 |
| 4 | 300MM SLOTTED PIPE | 21.0 | GHOSIYAN ARAULI | 26.318581 | 81.731691 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 700 LPM / 52 M | GHOSIYAN ARAULI | 26.318581 | 81.731691 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL / 14 M | GHOSIYAN ARAULI | 26.318581 | 81.731691 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 2.687 | |
| 2 | HDPE PIPE | 75 | 1.368 | |
| 3 | HDPE PIPE | 63 | 17.508 | |
| 4 | HDPE PIPE | 110 | 1.463 | |
| 5 | HDPE PIPE | 125 | 0.176 | |
| 6 | HDPE PIPE | 140 | 0.116 | |
| 7 | HDPE PIPE | 180 | 0.072 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 560 |