Project Completion Certificate (Ground Water)
Scheme ID: 20072806 Name of Scheme: GHOSIYAN & KASTOORIPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 4144 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Dec-2024 Actual Date of Completion (Capex): 24-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 41.3 GHOSIYAN ARAULI 26.318581 81.731691
2 300MM PLAIN PIPE 52.0 GHOSIYAN ARAULI 26.318581 81.731691
3 150MM SLOTTED PIPE 09.0 GHOSIYAN ARAULI 26.318581 81.731691
4 300MM SLOTTED PIPE 21.0 GHOSIYAN ARAULI 26.318581 81.731691
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 700 LPM / 52 M GHOSIYAN ARAULI 26.318581 81.731691
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 14 M GHOSIYAN ARAULI 26.318581 81.731691
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 2.687
2 HDPE PIPE 75 1.368
3 HDPE PIPE 63 17.508
4 HDPE PIPE 110 1.463
5 HDPE PIPE 125 0.176
6 HDPE PIPE 140 0.116
7 HDPE PIPE 180 0.072
HSC Connection
Sno. Total Nos.
1 560
Other Details
3.97
0.00
3.97
26-Aug-2024
10-Dec-2024