| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20072845 | Name of Scheme: Daranagar & Sewara GP water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 4800 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 10-Aug-2024 | Actual Date of Completion (Capex): 14-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 65.60 | DARA NAGAR | 26.562461 | 81.574182 |
| 2 | 150MM SLOTTED PIPE | 33 | DARA NAGAR | 26.562461 | 81.574182 |
| 3 | 200MM PLAIN PIPE | 105 | DARA NAGAR | 26.562461 | 81.574182 |
| 4 | 200MM SLOTTED PIPE | 27 | DARA NAGAR | 26.562461 | 81.574182 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 505LPM / 54MTR | DARA NAGAR | 26.562461 | 81.574182 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 300KL/ 16MTR | DARA NAGAR | 26.562461 | 81.574182 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | .301 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 4.695 | |
| 2 | HDPE PIPE | 63 | 9.103 | |
| 3 | HDPE PIPE | 110 | .610 | |
| 4 | HDPE PIPE | 125 | .803 | |
| 5 | HDPE PIPE | 140 | 1.434 | |
| 6 | HDPE PIPE | 160 | .809 | |
| 7 | HDPE PIPE | 180 | .681 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 820 |